top of page

BLOG


Replacing Standing & Running Rigging: Smooth Sailing Ahead
SY Letafet Launching Process The hull, deck, and mast of SY Letafet have been painted, and a new-generation Yanmar engine, radar, and chartplotter have been installed. The yacht has now been launched. The next steps include stepping the mast, renewing the standing rigging, fabricating the lazy bag and lazy jack systems, and replacing all running rigging. The sequence of tasks for these works is as follows: Letafet – Mast and Rigging Work Sequence 1. Preparation for Mast Inst

marmaristms
5 days ago2 min read


2004 Jeanneau Sun Odyssey 54 DS - €150k
Jeanneau Sun Odyssey 54 DS The Jeanneau Sun Odyssey 54 DS 5-cabin model is a spacious and comfortable sailing yacht designed for long...

marmaristms
Sep 304 min read


Why Yanmar 4JH4-TE Was The Only Choice For Our Boat?
2012 Model Yanmar 4JH4-TE Marine Diesel Engine Yanmar 4JH4-TE is a special marine diesel engine that stands out with its superior...

marmaristms
Sep 202 min read


1999 Beneteau 361 Oceanis Clipper - Withdrawn
Beneteau 361 Oceanis Review

marmaristms
Dec 2, 20243 min read
bottom of page
