Replacing Standing & Running Rigging: Smooth Sailing Ahead
SY Letafet Launching Process The hull, deck, and mast of SY Letafet have been painted, and a new-generation Yanmar engine, radar, and chartplotter have been installed. The yacht has now been launched. The next steps include stepping the mast, renewing the standing rigging, fabricating the lazy bag and lazy jack systems, and replacing all running rigging. The sequence of tasks for these works is as follows: Letafet – Mast and Rigging Work Sequence 1. Preparation for Mast Inst

marmaristms
Oct 282 min read


The Project: Full Renovation Including Teak Decking
Frers 48 We decided to completely renovate our Frers 48 sailing yacht, designed by German Frers and built at the Yu Chin Marine shipyard in Taiwan in 1984. As part of this project, we began renovating the 48-foot SY Hoschaf’s standing rigging and fittings, mast, boom, teak deck, interior cabin layout, ceilings, galley, toilets, as well as the floorboards and all sanitary and electrical installations, devices, and systems. However, in this article, we will only summarise the

marmaristms
Oct 162 min read
bottom of page